← Back to Montana
Planning pack for this site, £295Other options

Onshore wind · United States

Haymaker Hybrid

Operator Haymaker Energy Project LLC

Planned630 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Haymaker Hybrid is a 630 MW wind farm Wheatland County, Montana, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 2 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 107 incidents at wind farms in the United States, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Haymaker Hybrid sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 105 comparable onshore wind incidents in the United States, nearest first. The nearest is EIR-0806, GE turbine fire at Roundhouse wind farm in Wyoming, 419 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08062020GE turbine fire at Roundhouse wind farm in Wyoming419 kmSignificant
EIR-13452025Technician dies after fall from wind turbine in Wyoming598 kmMajor
EIR-07442025Damaged Vestas turbine to be decommissioned in Washington State754 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 102 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
630 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Haymaker Energy Project LLC
Owner
Haymaker Energy Project LLC
Location
Wheatland County, Montana, United States
Expected
2031
Balancing authority
NWMT

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Haymaker Hybrid. If you know of one, report it (confidential reports are anonymised).

Has Haymaker Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Haymaker Hybrid; it holds 107 incidents at wind farms in the United States.
What is the status of Haymaker Hybrid?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Haymaker Hybrid?
Wheatland County, Montana, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.