← Back to Shropshire

Solar · United Kingdom

Haughmond Quarry - Uffington Solar Farm

Operator Opdenergy UK 10 Limited

Application Refused25 MWData checked 16 November 2026Source record dated 13 June 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Haughmond Quarry - Uffington Solar Farm is a 25 MW solar farm 4.7 km north-east of Shrewsbury, Shropshire, United Kingdom. Its planning application (24/00724/FUL) went to Shropshire on 14 March 2024 and was refused on 7 June 2024. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 27 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

257 energy sites within 40 km for Haughmond Quarry - Uffington Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Opdenergy UK 10 Limited
Location
S/O B5062 W/O Haughmond Quarry, Shrewsbury, Shropshire, SY4 4RP, United Kingdom
Planning authority
Shropshire
Planning application
24/00724/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00724/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 14 March 2024 Planning application submitted
  • 7 June 2024 Planning permission refused

None found. The register holds no published incident that names Haughmond Quarry - Uffington Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Haughmond Quarry - Uffington Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Haughmond Quarry - Uffington Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Haughmond Quarry - Uffington Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 13 June 2024.
Where is Haughmond Quarry - Uffington Solar Farm?
4.7 km north-east of Shrewsbury, Shropshire, United Kingdom (postcode SY4 4RP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).