Solar · United Kingdom
Hatherden Farm
Operator Nextpower SPV 10 Limited
Operational49.9 MWData checked 16 November 2026Source record dated 11 November 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hatherden Farm is a 49.9 MW solar farm 4.3 km north of Andover, Hampshire, United Kingdom. Its planning application (19/03043/FULLN) went to Test Valley on 20 December 2019 and was granted on 5 June 2020. It has been operating since 1 October 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hatherden Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Nextpower SPV 10 Limited
- Location
- Hatherden Farm, Hatherden Lane, Hatherden, Andover, Hampshire, Hampshire, SP11 0HT, United Kingdom
- Planning authority
- Test Valley
- Planning application
- 19/03043/FULLN
- First operating
- 2025
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/03043/FULLN, with what the planning evidence pack adds for this site.
Every application in Test Valley · Alerts for applications and incidents near here
Timeline
- 20 December 2019 Planning application submitted
- 5 June 2020 Planning permission granted
- 1 August 2022 Construction started
- 1 October 2025 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Hatherden Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hatherden Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hatherden Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hatherden Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 November 2025.
- Where is Hatherden Farm?
- 4.3 km north of Andover, Hampshire, United Kingdom (postcode SP11 0HT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).