Solar · United Kingdom
Haigh Hall Solar Farm
Operator Athos Solar
Operational5 MWData checked 16 November 2026Source record dated 1 June 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Haigh Hall Solar Farm is a 5 MW solar farm 3.6 km north of Ossett, West Yorkshire, United Kingdom. Its planning application (16/02663/FU) went to Leeds on 4 May 2016. It has been operating since 1 February 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 70 other energy sites within 10 km, 49 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Haigh Hall Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Athos Solar
- Location
- Batley Road, Tingley, Wakefield, West Yorkshire, WF3 1HA, United Kingdom
- Planning authority
- Leeds
- Planning application
- 16/02663/FU
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 16/02663/FU, with what the planning evidence pack adds for this site.
Every application in Leeds · Alerts for applications and incidents near here
Timeline
- 4 May 2016 Planning application submitted
- 1 December 2016 Construction started
- 1 February 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Haigh Hall Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Haigh Hall Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Haigh Hall Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Haigh Hall Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 June 2017.
- Where is Haigh Hall Solar Farm?
- 3.6 km north of Ossett, West Yorkshire, United Kingdom (postcode WF3 1HA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).