Onshore wind · China
Guangxi Longxu Tonghuo wind farm
Operational50 MWChecked 8 October 2026Last changed in the dataset 24 October 2024
The site
- Technology
- Onshore wind
- Capacity
- 50 MW
- Status
- Operational (Operating)
- Operator
- Guangxi Wuzhou Tonghuo Wind Power Generation
- Owner
- State Power Investment Group Guangxi Changzhou Hydropower Development Co Ltd [95%]; China Energy Construction Group Guangxi Electric Power Design and Research Institute Co Ltd [5%]
- Location
- Dapo Town, Wuzhou, Guangxi, China
- First operating
- 2024
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Guangxi Longxu Tonghuo wind farm. If you know of one, report it (confidential reports are anonymised).
Follow Guangxi Longxu Tonghuo wind farm
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.