← Back to Texas

Onshore wind · United States

Green Pastures Wind I

Operator Green Pastures Wind I, LLC · Owner Acciona Energy USA Global, LLC

Operational150 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Green Pastures Wind I is a 150 MW wind farm Baylor County, Texas, United States. It first operated in 2015. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 107 incidents at wind farms in the United States, and 362 worldwide.

15 energy sites within 40 km for Green Pastures Wind I

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
150 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Green Pastures Wind I, LLC
Owner
Acciona Energy USA Global, LLC
Location
Baylor County, Texas, United States
First operating
2015
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Green Pastures Wind I. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Green Pastures Wind I had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Green Pastures Wind I; it holds 107 incidents at wind farms in the United States.
What is the status of Green Pastures Wind I?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Green Pastures Wind I?
Baylor County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.