← Back to Lancashire
Planning pack for this site, £295Other options

Solar · United Kingdom

Green Energy Park, Eyes Lane - Solar panels

Operator GA Pet Food Partners Group Limited

Application Submitted12 MWData checked 16 November 2026Source record dated 9 April 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Green Energy Park, Eyes Lane - Solar panels is a 12 MW solar farm in Chorley, Lancashire, United Kingdom. Its planning application (25/01256/FULMAJ) went to Chorley on 14 January 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 31 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Green Energy Park, Eyes Lane - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school19 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof60 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent71 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar (Co-located with RE)
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
GA Pet Food Partners Group Limited
Location
Green Energy Park, Asland Walks Eyes Lane, Bretherton, Chorley, Lancashire, PR6 6FS, United Kingdom
Planning authority
Chorley
Planning application
25/01256/FULMAJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/01256/FULMAJ, with what the planning evidence pack adds for this site.

Every application in Chorley · Alerts for applications and incidents near here

  • 14 January 2026 Planning application submitted

None found. The register holds no published incident that names Green Energy Park, Eyes Lane - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Green Energy Park, Eyes Lane - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Green Energy Park, Eyes Lane - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Green Energy Park, Eyes Lane - Solar panels?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 9 April 2026.
Where is Green Energy Park, Eyes Lane - Solar panels?
In Chorley, Lancashire, United Kingdom (postcode PR6 6FS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).