Solar · Germany
Greding II
Operator Solarparc Deutschland I GmbH & Co. KG
Operational1.4 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Greding II is a 1.4 MW solar farm 5.2 km north of Greding, Germany. It first operated in 2009. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 40 other energy sites within 10 km, 30 of them solar farms. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 456 worldwide.
Get an email when Greding II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.4 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Operational (In operation)
- Operator
- Solarparc Deutschland I GmbH & Co. KG
- Location
- Greding, Roth, Bayern, 91171, Germany
- First operating
- 2009
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 21 December 2009 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Greding II. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Greding II had a fire or other incident?
- None is on the register as of 10 November 2026. The register holds no published incident that names Greding II; it holds 6 incidents at solar farms in Germany.
- What is the status of Greding II?
- Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Greding II?
- 5.2 km north of Greding, Germany (postcode 91171).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).