Offshore wind · Taiwan
Greater Changhua Southeast wind farm
Operational605 MWChecked 8 October 2026Last changed in the dataset 1 November 2023
The site
- Technology
- Offshore wind
- Capacity
- 605 MW
- Status
- Operational (Operating)
- Operator
- Ørsted
- Owner
- Cathay Capital Private Equity SAS [25%]; Ørsted A/S [50%]; Caisse de dépôt et placement du Québec [25%]
- Location
- Fangyuan Town, Changhua County, Taiwan
- First operating
- 2023
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Greater Changhua Southeast wind farm. If you know of one, report it (confidential reports are anonymised).
Follow Greater Changhua Southeast wind farm
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.