Solar · United States
Greasewood Solar
Operator Concho Bluff LLC
Operational255 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Greasewood Solar is a 255 MW solar farm 40 km east of Fort Stockton, Pecos County, Texas, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Greasewood Solar changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 255 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- Concho Bluff LLC
- Owner
- Concho Bluff LLC
- Location
- Pecos County, Texas, United States
- First operating
- 2021
- Balancing authority
- ERCO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Greasewood Solar. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Greasewood Solar had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Greasewood Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Greasewood Solar?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Greasewood Solar?
- 40 km east of Fort Stockton, Pecos County, Texas, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).