← Back to Kent

Solar · United Kingdom

Grain Harvesters Ltd

Operator Grain Harvesters Ltd

Operational1 MWData checked 16 November 2026Source record dated 6 January 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Grain Harvesters Ltd is a 1 MW solar farm 8.5 km south-east of Sturry, Kent, United Kingdom. Its planning application (13/01006) went to Dover on 5 December 2013 and was granted on 6 March 2014. It has been operating since 1 December 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 40 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

224 energy sites within 40 km for Grain Harvesters Ltd

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Grain Harvesters Ltd
Location
Grain Harvesters Ltd, Staple Road, Wingham, Canterbury, CT3 1LS, Kent, CT3 1LS, United Kingdom
Planning authority
Dover
Planning application
13/01006
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/01006, with what the planning evidence pack adds for this site.

Every application in Dover · Alerts for applications and incidents near here

  • 5 December 2013 Planning application submitted
  • 6 March 2014 Planning permission granted
  • 21 September 2014 Construction started
  • 1 December 2014 Operational

None found. The register holds no published incident that names Grain Harvesters Ltd. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Grain Harvesters Ltd had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Grain Harvesters Ltd; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Grain Harvesters Ltd?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 January 2016.
Where is Grain Harvesters Ltd?
8.5 km south-east of Sturry, Kent, United Kingdom (postcode CT3 1LS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).