← Back to Texas
Planning pack for this site, £295Other options

Onshore wind · United States

Goodnight Wind II

Operator FGE Goodnight II, LLC

Under construction266 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Goodnight Wind II is a 266 MW wind farm 44 km east of Canyon, Armstrong County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 107 incidents at wind farms in the United States, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Goodnight Wind II sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 105 comparable onshore wind incidents in the United States, nearest first. The nearest is EIR-2741, Wind turbine catches fire in Donley County, 56 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27412021Wind turbine catches fire in Donley County56 kmSignificant
EIR-10122017Wind turbine catches fire at Salt Fork Wind Facility, Donley County56 kmSignificant
EIR-10292017Worker fatally electrocuted atop turbine at Invenergy wind farm, Camp Springs, Texas252 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 102 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
266 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
FGE Goodnight II, LLC
Owner
FGE Goodnight II, LLC
Location
Armstrong County, Texas, United States
Expected
2027
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Goodnight Wind II. If you know of one, report it (confidential reports are anonymised).

Has Goodnight Wind II had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Goodnight Wind II; it holds 107 incidents at wind farms in the United States.
What is the status of Goodnight Wind II?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Goodnight Wind II?
44 km east of Canyon, Armstrong County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).