Solar · United Kingdom
Goldhurst Distributions, Hollington Road - Solar Panels
Operator Goldhurst Distributions Limited
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 15 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Goldhurst Distributions, Hollington Road - Solar Panels is a 0.2 MW solar farm 3.9 km south-east of Cheadle, Staffordshire, United Kingdom. Its planning application (DET/2026/0009) went to Staffordshire Moorlands on 17 March 2026 and was granted on 11 May 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Goldhurst Distributions, Hollington Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Goldhurst Distributions, Hollington Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1546, Solar panel isolation switch overheats in roof fire at a house in Bucknall, 15 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 15 km | Minor |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 19 km | Minor |
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 36 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Goldhurst Distributions Limited
- Location
- Goldhurst Farm , Hollington Road , Winnothdale, Staffordshire, ST10 4HY, United Kingdom
- Planning authority
- Staffordshire Moorlands
- Planning application
- DET/2026/0009
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DET/2026/0009, with what the planning evidence pack adds for this site.
Every application in Staffordshire Moorlands · Alerts for applications and incidents near here
Timeline
- 17 March 2026 Planning application submitted
- 11 May 2026 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Goldhurst Distributions, Hollington Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Goldhurst Distributions, Hollington Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Goldhurst Distributions, Hollington Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Goldhurst Distributions, Hollington Road - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 June 2026.
- Where is Goldhurst Distributions, Hollington Road - Solar Panels?
- 3.9 km south-east of Cheadle, Staffordshire, United Kingdom (postcode ST10 4HY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).