← Back to Goiás

Solar · Brazil

Goiânia Companhia Celg de Participaçoes - Celgpar solar project

Operational5 MWData checked 8 October 2026Source record dated 11 June 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Goiânia Companhia Celg de Participaçoes - Celgpar solar project is a 5 MW solar farm in Goiânia, Goiás, Brazil. It first operated in 2024. Its status in the Global Energy Monitor solar and wind trackers is operational. There are 4 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil, and 480 worldwide.

6 energy sites within 40 km for Goiânia Companhia Celg de Participaçoes - Celgpar solar…

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Operational (Operating)
Location
Goiânia, Goiás, Brazil
First operating
2024

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Goiânia Companhia Celg de Participaçoes - Celgpar solar project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Goiânia Companhia Celg de Participaçoes - Celgpar solar project had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Goiânia Companhia Celg de Participaçoes - Celgpar solar project; it holds 18 incidents at solar farms (hybrid battery and solar sites included) in Brazil.
What is the status of Goiânia Companhia Celg de Participaçoes - Celgpar solar project?
Operational, in the Global Energy Monitor solar and wind trackers, where it last changed on 11 June 2025.
Where is Goiânia Companhia Celg de Participaçoes - Celgpar solar project?
In Goiânia, Goiás, Brazil.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).