← Back to Ayrshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Glenkiln Farm, Lamlash Brodick - Solar Farm

Operator Arran Community Renewables

Awaiting Construction5.6 MWData checked 16 November 2026Source record dated 24 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Glenkiln Farm, Lamlash Brodick - Solar Farm is a 5.6 MW solar farm 7.2 km south-east of Isle of Arran, Ayrshire, United Kingdom. Its planning application (25/00017/PP) went to North Ayrshire on 20 January 2025 and was granted on 20 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Glenkiln Farm, Lamlash Brodick - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 121 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline121 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School149 kmSignificant
EIR-14762026House fire reported to have started on solar panels in Carnoustie186 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Arran Community Renewables
Location
Glenkiln Farm, Lamlash Brodick, Isle of Arran, Ayrshire, KA27 8NT, United Kingdom
Planning authority
North Ayrshire
Planning application
25/00017/PP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00017/PP, with what the planning evidence pack adds for this site.

Every application in North Ayrshire · Alerts for applications and incidents near here

  • 20 January 2025 Planning application submitted
  • 20 March 2025 Planning permission granted

None found. The register holds no published incident that names Glenkiln Farm, Lamlash Brodick - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Glenkiln Farm, Lamlash Brodick - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Glenkiln Farm, Lamlash Brodick - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Glenkiln Farm, Lamlash Brodick - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 August 2026.
Where is Glenkiln Farm, Lamlash Brodick - Solar Farm?
7.2 km south-east of Isle of Arran, Ayrshire, United Kingdom (postcode KA27 8NT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).