Solar · United Kingdom

Glenhead Farm (Upper)

Operator Environmental Energy Investments

Planning Permission Expired5 MWData checked 16 November 2026Source record dated 28 July 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Glenhead Farm (Upper) is a 5 MW solar farm 3.1 km north-east of Kilsyth, Lanarkshire, United Kingdom. Its planning application (15/02233/FUL) went to North Lanarkshire on 21 October 2015 and was granted on 6 July 2016. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 16 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 443 energy sites within 40 km for Glenhead Farm (Upper)

Members see the sites and incidents around this one, and every record behind them.

ENVIRONMENTAL ENERGY INVESTMENTS LTD (NI073010), dissolved, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Environmental Energy Investments
Location
Glenhead Farm, High Banton Road, Kilsyth, Glasgow, Strathclyde, Scotland, Lanarkshire, G65 0RB, United Kingdom
Planning authority
North Lanarkshire
Planning application
15/02233/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/02233/FUL, with what the planning evidence pack adds for this site.

Every application in North Lanarkshire · Alerts for applications and incidents near here

  • 21 October 2015 Planning application submitted
  • 6 July 2016 Planning permission granted
  • 6 July 2021 Planning permission expired

None found. The register holds no published incident that names Glenhead Farm (Upper). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Glenhead Farm (Upper) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Glenhead Farm (Upper); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Glenhead Farm (Upper)?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2020.
Where is Glenhead Farm (Upper)?
3.1 km north-east of Kilsyth, Lanarkshire, United Kingdom (postcode G65 0RB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).