← Back to Co. Down
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Garvaghy Road Replacement Turbine

Operator Hill Power Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 8 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Garvaghy Road Replacement Turbine is a wind farm 5.3 km south of Dromore, Co. Down, United Kingdom. Its planning application (LA08/2021/0223/F) went to Armagh City, Banbridge and Craigavon on 9 February 2021 and was granted on 26 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

HILL POWER LIMITED (OE035310), registered, since 2026. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Garvaghy Road Replacement Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 59 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm59 kmSignificant
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh95 kmMinor
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire119 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Hill Power Limited
Location
Lands 442m west north west of 26 Garvaghy Road Banbridge, Co. Down, BT32 3SZ, United Kingdom
Planning authority
Armagh City, Banbridge and Craigavon
Planning application
LA08/2021/0223/F
Turbines
1, 77.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA08/2021/0223/F, with what the planning evidence pack adds for this site.

Every application in Armagh City, Banbridge and Craigavon · Alerts for applications and incidents near here

  • 9 February 2021 Planning application submitted
  • 26 June 2024 Planning permission granted

None found. The register holds no published incident that names Garvaghy Road Replacement Turbine. If you know of one, report it (confidential reports are anonymised).

Has Garvaghy Road Replacement Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Garvaghy Road Replacement Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Garvaghy Road Replacement Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2024.
Where is Garvaghy Road Replacement Turbine?
5.3 km south of Dromore, Co. Down, United Kingdom (postcode BT32 3SZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).