Around this site

← Back to Gansu

Solar · China

Gansu Uranium Mining Area wind and solar base

Planned (permitted)400 MWChecked 8 October 2026Last changed in the dataset 27 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gansu Uranium Mining Area wind and solar base sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
400 MW
Status
Planned (permitted) (Pre-construction)
Owner
China Nuclear Industry Group Co Ltd [100%]
Location
Uranium Mining Area, Jiuquan, Gansu, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Gansu Uranium Mining Area wind and solar base. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.