← Back to Hampshire

Solar · United Kingdom

Fullenton Solar Farm

Operator Tealing Solar Parks

Operational4.2 MWData checked 16 November 2026Source record dated 27 June 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Fullenton Solar Farm is a 4.2 MW solar farm 6.7 km south of Andover, Hampshire, United Kingdom. Its planning application (15/01401/FULLN) went to Test Valley on 25 June 2015 and was granted on 11 December 2015. It has been operating since 15 December 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 32 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 325 energy sites within 40 km for Fullenton Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Tealing Solar Parks
Location
Land At Fullerton Farm, Fullerton Road, Cottonworth, Andover, Hampshire, Hampshire, SP11 7JX, United Kingdom
Planning authority
Test Valley
Planning application
15/01401/FULLN
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01401/FULLN, with what the planning evidence pack adds for this site.

Every application in Test Valley · Alerts for applications and incidents near here

  • 25 June 2015 Planning application submitted
  • 11 December 2015 Planning permission granted
  • 15 October 2016 Construction started
  • 15 December 2016 Operational

None found. The register holds no published incident that names Fullenton Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Fullenton Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fullenton Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Fullenton Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 June 2017.
Where is Fullenton Solar Farm?
6.7 km south of Andover, Hampshire, United Kingdom (postcode SP11 7JX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).