Solar · Germany
Friesen
Operator LHI SolarWind PV Portfolio 2407 GmbH & Co. KG
Operational7.5 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Friesen is a 7.5 MW solar farm on the edge of Hirschaid, Germany. It first operated in 2019. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 11 other energy sites within 10 km, 6 of them solar farms. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 458 worldwide.
Get an email when Friesen changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 7.5 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Operational (In operation)
- Operator
- LHI SolarWind PV Portfolio 2407 GmbH & Co. KG
- Location
- Hirschaid, Bamberg, Bayern, 96114, Germany
- First operating
- 2019
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 1 July 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Friesen. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Friesen had a fire or other incident?
- None is on the register as of 11 November 2026. The register holds no published incident that names Friesen; it holds 6 incidents at solar farms in Germany.
- What is the status of Friesen?
- Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Friesen?
- On the edge of Hirschaid, Germany (postcode 96114).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).