Solar · United Kingdom
Friern Barnet School, Hemington Avenue - Solar Panels
Operator Repowering London
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 5 August 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Friern Barnet School, Hemington Avenue - Solar Panels is a 0.2 MW solar farm in Friern Barnet, London, United Kingdom. Its planning application (25/0454/FUL) went to Barnet on 4 February 2025 and was granted on 23 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 52 other energy sites within 10 km, 38 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Friern Barnet School, Hemington Avenue - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
REPOWERING LONDON LTD (15381963), active, since 2024. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Friern Barnet School, Hemington Avenue - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 2.6 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1514 | 2024 | Garage fire destroys solar panels in Southgate, with a battery storage fault suspected | 2.6 km | Minor |
| EIR-1170 | 2025 | Rooftop solar panels catch fire at IKEA store in Wembley | 11 km | Significant |
| EIR-0774 | 2023 | Solar panel fire destroys roof of Ealing Council house in Greenford | 17 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Repowering London
- Location
- Friern Barnet School Hemington Avenue, London, N11 3LS, United Kingdom
- Planning authority
- Barnet
- Planning application
- 25/0454/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 25/0454/FUL, with what the planning evidence pack adds for this site.
Every application in Barnet · Alerts for applications and incidents near here
Timeline
- 4 February 2025 Planning application submitted
- 23 July 2025 Planning permission granted
- 23 July 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Friern Barnet School, Hemington Avenue - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Friern Barnet School, Hemington Avenue - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Friern Barnet School, Hemington Avenue - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Friern Barnet School, Hemington Avenue - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2025.
- Where is Friern Barnet School, Hemington Avenue - Solar Panels?
- In Friern Barnet, London, United Kingdom (postcode N11 3LS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).