Solar · United Kingdom

Forest Gate - Solar Farm & Battery Storage

Operator Eden Renewables

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 28 June 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Forest Gate - Solar Farm & Battery Storage is a 49.9 MW solar farm 3.8 km south-east of Chippenham, Wiltshire, United Kingdom. Its planning application (PL/2021/06112) went to Wiltshire on 11 June 2021 and was granted on 10 March 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 48 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EDEN RENEWABLES LTD (10293194), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Forest Gate - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire32 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter125 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction173 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Eden Renewables
Location
Forest Gate, Pewsham, Chippenham, Wiltshire, SN15 3RS, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2021/06112

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2021/06112, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 11 June 2021 Planning application submitted
  • 10 March 2023 Planning permission granted
  • 10 March 2026 Planning permission expired

None found. The register holds no published incident that names Forest Gate - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Forest Gate - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Forest Gate - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Forest Gate - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 June 2021.
Where is Forest Gate - Solar Farm & Battery Storage?
3.8 km south-east of Chippenham, Wiltshire, United Kingdom (postcode SN15 3RS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).