Battery storage · United Kingdom

Fingle Drive, Grafton Street - Battery Energy Storage System

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Application Refused0.2 MWData checked 16 November 2026Source record dated 1 April 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Fingle Drive, Grafton Street - Battery Energy Storage System is a 0.2 MW battery storage site 3.5 km north-west of Milton Keynes, Buckinghamshire, United Kingdom. Its planning application (PLN/2024/2494) went to Milton Keynes on 25 November 2024 and was refused on 17 March 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 109 other energy sites within 10 km, 39 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 382 other sites and 578 energy sites within 40 km for Fingle Drive, Grafton Street - Battery Energy Storage System

Members see the sites and incidents around this one, and every record behind them.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Verge at the end of Fingle Drive, Stonebridge, Milton Keynes, Buckinghamshire, MK13 0DN, United Kingdom
Planning authority
Milton Keynes
Planning application
PLN/2024/2494

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PLN/2024/2494, with what the planning evidence pack adds for this site.

Every application in Milton Keynes · Alerts for applications and incidents near here

  • 25 November 2024 Planning application submitted
  • 17 March 2025 Planning permission refused

None found. The register holds no published incident that names Fingle Drive, Grafton Street - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Fingle Drive, Grafton Street - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fingle Drive, Grafton Street - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Fingle Drive, Grafton Street - Battery Energy Storage System?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2025.
Where is Fingle Drive, Grafton Street - Battery Energy Storage System?
3.5 km north-west of Milton Keynes, Buckinghamshire, United Kingdom (postcode MK13 0DN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).