Solar · United States
Fighting Jays Solar Project
Operator AP Solar 2, LLC
Operational228 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Fighting Jays Solar Project is a 228 MW solar farm 23 km south of Greatwood, Fort Bend County, Texas, United States. It first operated in 2022. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 6 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds one incident at this site, the latest in 2024.
Incidents on the register at this site
A large solar farm about an hour southwest of Houston suffered extensive panel damage in a hailstorm on 15 March 2024. Copenhagen Infrastructure Partners said its Fighting Jays Solar project was damaged. The project website describes the site as spanning...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Fighting Jays Solar Project changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 228 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- AP Solar 2, LLC
- Owner
- AP Solar 2, LLC
- Location
- Fort Bend County, Texas, United States
- First operating
- 2022
- Balancing authority
- ERCO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Fighting Jays Solar Project had a fire or other incident?
- Yes. The register holds one incident that names it: Hail damages Fighting Jays solar farm southwest of Houston (EIR-1928, 2024).
- What is the status of Fighting Jays Solar Project?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Fighting Jays Solar Project?
- 23 km south of Greatwood, Fort Bend County, Texas, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).