← Back to California

Battery storage · United States

Fifth Standard Solar PV, LLC (Hybrid)

Operator RWE Americas, LLC · Owner RWE Clean Energy

Operational137 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Fifth Standard Solar PV, LLC (Hybrid) is a 137 MW battery storage site 5.5 km south of Huron, Fresno County, California, United States. It first operated in 2023. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 9 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 184 other sites and 65 energy sites within 40 km for Fifth Standard Solar PV, LLC (Hybrid)

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (137 MWh)
Capacity
137 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
RWE Americas, LLC
Owner
RWE Clean Energy
Location
Fresno County, California, United States
First operating
2023
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Fifth Standard Solar PV, LLC (Hybrid). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Fifth Standard Solar PV, LLC (Hybrid) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fifth Standard Solar PV, LLC (Hybrid); it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Fifth Standard Solar PV, LLC (Hybrid)?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Fifth Standard Solar PV, LLC (Hybrid)?
5.5 km south of Huron, Fresno County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).