← Back to California
Planning pack for this site, £295Other options

Battery storage · United States

Key Energy Storage

Operator Key Energy Storage LLC

Under construction300 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Key Energy Storage is a 300 MW battery storage site 7.8 km south of Huron, Fresno County, California, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 10 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Key Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-2587, PG&E shuts Elkhorn battery site after neighbouring Vistra facility fire, 113 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25872025PG&E shuts Elkhorn battery site after neighbouring Vistra facility fire113 kmNear-miss
EIR-03892026Cable short circuit trips offline Nipomo battery storage facility in California126 kmNear-miss
EIR-01282024Battery storage failure at Edwards Sanborn E2 in Kern County, California154 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
300 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction; some generators planned
Operator
Key Energy Storage LLC
Owner
Key Energy Storage LLC
Location
Fresno County, California, United States
Expected
2026
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Key Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Key Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Key Energy Storage; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Key Energy Storage?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Key Energy Storage?
7.8 km south of Huron, Fresno County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).