Solar · United Kingdom

Farnborough International Exhibition Centre, Etps Road - Solar Panels

Operator Farnborough International Limited

Under Construction1.2 MWData checked 16 November 2026Source record dated 19 February 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Farnborough International Exhibition Centre, Etps Road - Solar Panels is a 1.2 MW solar farm on the edge of Farnborough, Hampshire, United Kingdom. Its planning application (23/00885/FULPP) went to Rushmoor on 20 December 2023 and was granted on 15 February 2024. Construction started on 4 December 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 45 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Farnborough International Exhibition Centre, Etps Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1531, Fire involving solar panels damages roof of flats in Fleet, 5.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15312022Fire involving solar panels damages roof of flats in Fleet5.8 kmSignificant
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing20 kmMinor
EIR-29392026Rooftop solar fire forces West Drayton school to close early32 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Farnborough International Limited
Location
Farnborough International Exhibition & Conference Centre, Etps Road, Farnborough, Hampshire, GU14 6TQ, United Kingdom
Planning authority
Rushmoor
Planning application
23/00885/FULPP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00885/FULPP, with what the planning evidence pack adds for this site.

Every application in Rushmoor · Alerts for applications and incidents near here

  • 4 December 2023 Construction started
  • 20 December 2023 Planning application submitted
  • 15 February 2024 Planning permission granted

None found. The register holds no published incident that names Farnborough International Exhibition Centre, Etps Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Farnborough International Exhibition Centre, Etps Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Farnborough International Exhibition Centre, Etps Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Farnborough International Exhibition Centre, Etps Road - Solar Panels?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2024.
Where is Farnborough International Exhibition Centre, Etps Road - Solar Panels?
On the edge of Farnborough, Hampshire, United Kingdom (postcode GU14 6TQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).