Solar · United Kingdom

Europa Way, Units F1 & F2 - Solar panels

Operator Amr Textiles Limited

Application Refused0.9 MWData checked 16 November 2026Source record dated 9 May 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Europa Way, Units F1 & F2 - Solar panels is a 0.9 MW solar farm on the edge of Kearsley, Greater Manchester, United Kingdom. Its planning application (13568/22) went to Bolton on 9 February 2022 and was refused on 30 March 2023. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 76 other energy sites within 10 km, 51 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 730 energy sites within 40 km for Europa Way, Units F1 & F2 - Solar panels

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
0.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Amr Textiles Limited
Location
AMR Textiles Ltd, Units F1, F2, E2, E3, and E4, Europa Way, Stoneclough Radcliffe, Bolton, ., Greater Manchester, M26 1GG, United Kingdom
Planning authority
Bolton
Planning application
13568/22

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13568/22, with what the planning evidence pack adds for this site.

Every application in Bolton · Alerts for applications and incidents near here

  • 9 February 2022 Planning application submitted
  • 30 March 2023 Planning permission refused

None found. The register holds no published incident that names Europa Way, Units F1 & F2 - Solar panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Europa Way, Units F1 & F2 - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Europa Way, Units F1 & F2 - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Europa Way, Units F1 & F2 - Solar panels?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 9 May 2022.
Where is Europa Way, Units F1 & F2 - Solar panels?
On the edge of Kearsley, Greater Manchester, United Kingdom (postcode M26 1GG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).