Planning pack for this site, launch price £145Other options

Solar · Spain

Erasmo solar farm

Planned (permitted)1200 MWChecked 8 October 2026Last changed in the dataset 29 January 2025

Erasmo solar farm is a 1200 MW solar farm 45 km north-west of Almodóvar del Campo, Ciudad Real, Castilla-La Mancha, Spain. It first operated in 2029. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 7 incidents at solar farms in Spain, and 359 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Erasmo solar farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

The pack for this site lists 7 comparable solar incidents in Spain, nearest first. The nearest is EIR-1687, Fire burns about 90 hectares at Puertollano solar plant, 52 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16872026Fire burns about 90 hectares at Puertollano solar plant52 kmSignificant
EIR-11852026Vegetation fire reaches two solar plants near Torrecera285 kmMinor
EIR-13402026Vegetation fire extinguished at Jarafuel solar plant306 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 4 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1200 MW
Status
Planned (permitted) (Pre-construction)
Operator
Soto Solar
Owner
COFRA Group [100%]
Location
Saceruela, Ciudad Real, Castilla-La Mancha, Spain
First operating
2029

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Erasmo solar farm. If you know of one, report it (confidential reports are anonymised).

Has Erasmo solar farm had a fire or other incident?
None is on the register as of 12 October 2026. The register holds no published incident that names Erasmo solar farm; it holds 7 incidents at solar farms in Spain.
What is the status of Erasmo solar farm?
Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 29 January 2025.
Where is Erasmo solar farm?
45 km north-west of Almodóvar del Campo, Ciudad Real, Castilla-La Mancha, Spain.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).