ENERGIES DU RECHET 2

Operational11.1 MWChecked 6 October 2026

Technology
Onshore wind
Capacity
11.1 MW
Status
Operational (En service)
Location
Villers-Grélot, Doubs, Bourgogne-Franche-Comté, France
First operating
2017
Network operator
Enedis

View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.

  • 19 January 2017 Connected to the grid
  • 19 January 2017 Operational

None found. The register holds no published incident that names ENERGIES DU RECHET 2. If you know of one, report it (confidential reports are anonymised).

The register holds 1 incident at onshore wind farms in France, 1 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts.