Planning pack for this site, £295Other options

Onshore wind · Germany

Energiepark Brunow Klüß

Operator Energiepark Brunow Klüß GmbH & Co. KG, NE-WEA Brunow-Klüß GmbH & Co. KG

Planned28.8 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Energiepark Brunow Klüß is a 28.8 MW wind farm 10 km north-east of Karstädt, Brunow, Ludwigslust-Parchim, Mecklenburg-Vorpommern, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 19 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Energiepark Brunow Klüß sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-1802, Wind turbine collapses in Mecklenburg-Vorpommern after storm damage, 78 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-18022023Wind turbine collapses in Mecklenburg-Vorpommern after storm damage78 kmSignificant
EIR-18042023Wind turbine reported to have collapsed after a wind gust in Rostock, Germany97 kmMajor
EIR-22402026Nacelle fire on wind turbine at Bürgerwindpark Fehmarn, Germany144 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
28.8 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Energiepark Brunow Klüß GmbH & Co. KG, NE-WEA Brunow-Klüß GmbH & Co. KG
Location
Brunow, Ludwigslust-Parchim, Mecklenburg-Vorpommern, 19357, Germany
First operating
2027
Turbines
7

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Energiepark Brunow Klüß. If you know of one, report it (confidential reports are anonymised).

Has Energiepark Brunow Klüß had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Energiepark Brunow Klüß; it holds 30 incidents at wind farms in Germany.
What is the status of Energiepark Brunow Klüß?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Energiepark Brunow Klüß?
10 km north-east of Karstädt, Brunow, Ludwigslust-Parchim, Mecklenburg-Vorpommern, Germany (postcode 19357).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).