Around this site

← Back to Sonora

Solar · Mexico

El Mayo Photovoltaic solar farm

Operational126 MWChecked 8 October 2026Last changed in the dataset 25 July 2023

Technology
Solar
Capacity
126 MW
Status
Operational (Operating)
Operator
Korea Electric Power
Owner
Korea Electric Power Corp; Sprott Korea
Location
Hermosillo, Sonora, Mexico
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names El Mayo Photovoltaic solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.