← Back to Grampian

Onshore wind · United Kingdom

Easter Tolmauds

Operator Frank A Smart & Son Ltd

Operational1.6 MWData checked 16 November 2026Source record dated 3 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Easter Tolmauds is a 1.6 MW wind farm 14 km north-west of Banchory, Grampian, United Kingdom. Its planning application (APP/2014/1890) went to Aberdeenshire on 20 May 2014 and was granted on appeal on 29 May 2015. It has been operating since 15 October 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 10 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

219 energy sites within 40 km for Easter Tolmauds

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Frank A Smart & Son Ltd
Location
Easter Tolmauds, Torphins, Banchory, Grampian, Grampian, AB31 4PP, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2014/1890
Appeal reference
PPA-110-2239
First operating
2016
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2014/1890, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 20 May 2014 Planning application submitted
  • 22 August 2014 Planning permission refused
  • 15 October 2014 Appeal lodged
  • 29 May 2015 Planning permission granted
  • 29 May 2015 Appeal granted
  • 1 February 2016 Construction started
  • 15 October 2016 Operational

None found. The register holds no published incident that names Easter Tolmauds. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Easter Tolmauds had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Easter Tolmauds; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Easter Tolmauds?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2020.
Where is Easter Tolmauds?
14 km north-west of Banchory, Grampian, United Kingdom (postcode AB31 4PP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).