Onshore wind · United Kingdom
Earlsburn North (Kingsburn) Wind Farm
Operator Falck Renewables
Operational22.5 MWData checked 16 November 2026Source record dated 31 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Earlsburn North (Kingsburn) Wind Farm is a 22.5 MW wind farm 12 km west of Stirling, United Kingdom. Its planning application (08/00104/DET) went to Stirling on 8 February 2008 and was granted on 1 April 2010. It has been operating since 30 May 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 8 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Earlsburn North (Kingsburn) Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 22.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Falck Renewables
- Location
- Earlsburn, Gargunnock Hills, Stirling, United Kingdom
- Planning authority
- Stirling
- Planning application
- 08/00104/DET
- First operating
- 2016
- Turbines
- 9
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 08/00104/DET, with what the planning evidence pack adds for this site.
Every application in Stirling · Alerts for applications and incidents near here
Timeline
- 8 February 2008 Planning application submitted
- 1 April 2010 Planning permission granted
- 1 June 2014 Construction started
- 30 May 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Earlsburn North (Kingsburn) Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Earlsburn North (Kingsburn) Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Earlsburn North (Kingsburn) Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Earlsburn North (Kingsburn) Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 May 2016.
- Where is Earlsburn North (Kingsburn) Wind Farm?
- 12 km west of Stirling, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).