Solar · United Kingdom

Dura Park Bynea Industrial Site

Operator Short Bros Homes

Operational1.4 MWData checked 16 November 2026Source record dated 14 June 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dura Park Bynea Industrial Site is a 1.4 MW solar farm 3.3 km west of Gorseinon, Carmarthenshire, United Kingdom. Its planning application (S/32873) went to Carmarthenshire on 22 October 2015 and was granted on 15 December 2015. It has been operating since 21 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 47 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

205 energy sites within 40 km for Dura Park Bynea Industrial Site

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Short Bros Homes
Location
Former Bowdens Site, Yspitty Road, Dura Industrial Park, Llanelli, Dyfed, Wales, Carmarthenshire, SA14 9TD, United Kingdom
Planning authority
Carmarthenshire
Planning application
S/32873
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/32873, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 1 September 2015 Construction started
  • 22 October 2015 Planning application submitted
  • 15 December 2015 Planning permission granted
  • 21 December 2015 Operational

None found. The register holds no published incident that names Dura Park Bynea Industrial Site. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Dura Park Bynea Industrial Site had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dura Park Bynea Industrial Site; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dura Park Bynea Industrial Site?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 June 2016.
Where is Dura Park Bynea Industrial Site?
3.3 km west of Gorseinon, Carmarthenshire, United Kingdom (postcode SA14 9TD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).