Solar · United Kingdom
DPD Distribution Centre
Operator DPD
Operational1 MWData checked 16 November 2026Source record dated 2 February 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
DPD Distribution Centre is a 1 MW solar farm in Oldbury, West Midlands, United Kingdom. Its planning application (PD/15/00438) went to Sandwell on 27 November 2015 and was granted on 30 December 2015. It has been operating since 10 January 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 128 other energy sites within 10 km, 78 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when DPD Distribution Centre changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- DPD
- Location
- GeoPost Uk Limited Hub 3 Broadwell Road Oldbury B69 4DA, West Midlands, B69 4DA, United Kingdom
- Planning authority
- Sandwell
- Planning application
- PD/15/00438
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PD/15/00438, with what the planning evidence pack adds for this site.
Every application in Sandwell · Alerts for applications and incidents near here
Timeline
- 27 November 2015 Planning application submitted
- 30 December 2015 Planning permission granted
- 10 December 2016 Construction started
- 10 January 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names DPD Distribution Centre. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has DPD Distribution Centre had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names DPD Distribution Centre; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of DPD Distribution Centre?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2017.
- Where is DPD Distribution Centre?
- In Oldbury, West Midlands, United Kingdom (postcode B69 4DA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).