← Back to Lancashire
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Doughty Farm, Back Lane - Wind Turbine

Operator Constantine Group Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 10 February 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Doughty Farm, Back Lane - Wind Turbine is a 0.2 MW wind farm on the edge of Colne, Lancashire, United Kingdom. Its planning application (24/0836/FUL) went to Pendle on 5 December 2024 and was granted on 4 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 18 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

CONSTANTINE GROUP LIMITED (00649369), active, since 1960. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Doughty Farm, Back Lane - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1624, Crane topples on Scout Moor wind farm project, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16242026Crane topples on Scout Moor wind farm project26 kmMajor
EIR-07322026Nordex turbine damaged by suspected lightning strike at UK wind farm43 kmMinor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate45 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Constantine Group Limited
Location
Doughty Farm, Back Lane, Burnley, Lancashire, BB10 3RG, United Kingdom
Planning authority
Pendle
Planning application
24/0836/FUL
Turbines
1, 76 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/0836/FUL, with what the planning evidence pack adds for this site.

Every application in Pendle · Alerts for applications and incidents near here

  • 5 December 2024 Planning application submitted
  • 4 February 2025 Planning permission granted
  • 4 February 2028 Planning permission runs out

None found. The register holds no published incident that names Doughty Farm, Back Lane - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Doughty Farm, Back Lane - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Doughty Farm, Back Lane - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Doughty Farm, Back Lane - Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 February 2025.
Where is Doughty Farm, Back Lane - Wind Turbine?
On the edge of Colne, Lancashire, United Kingdom (postcode BB10 3RG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).