← Back to Colorado

Solar · United States

Dolores Canyon Solar

Operator Tri-State G & T Assn, Inc

Operational110 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dolores Canyon Solar is a 110 MW solar farm 42 km north of Cortez, Dolores County, Colorado, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 1 other site and 3 energy sites within 40 km for Dolores Canyon Solar

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
110 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Tri-State G & T Assn, Inc
Owner
Tri-State G & T Assn, Inc
Location
Dolores County, Colorado, United States
First operating
2025
Balancing authority
WACM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Dolores Canyon Solar. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Dolores Canyon Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dolores Canyon Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Dolores Canyon Solar?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Dolores Canyon Solar?
42 km north of Cortez, Dolores County, Colorado, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).