Docks Way - Solar Panels

Operator Newport City Council

Awaiting Construction1 MWData checked 16 November 2026Source record dated 27 August 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Docks Way - Solar Panels is a 1 MW solar farm on the edge of Newport, Gwent, United Kingdom. Its planning application (23/0989) went to Newport on 4 January 2023 and was granted on 7 August 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 54 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Docks Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels32 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol32 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol33 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Newport City Council
Location
S/O Docks Way Disposal Site, Docks Way, Newport, Gwent, NP20 2NS, United Kingdom
Planning authority
Newport
Planning application
23/0989

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0989, with what the planning evidence pack adds for this site.

Every application in Newport · Alerts for applications and incidents near here

  • 4 January 2023 Planning application submitted
  • 7 August 2024 Planning permission granted

None found. The register holds no published incident that names Docks Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Docks Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Docks Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Docks Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 August 2024.
Where is Docks Way - Solar Panels?
On the edge of Newport, Gwent, United Kingdom (postcode NP20 2NS).