Planning pack for this site, £295Other options

Solar · United Kingdom

Deritend Precision Casting, Vines Lane - Solar Panels

Operator Green Nation Solar Energy

Awaiting Construction1.2 MWData checked 16 November 2026Source record dated 26 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Deritend Precision Casting, Vines Lane - Solar Panels is a 1.2 MW solar farm in Droitwich, Worcestershire, United Kingdom. Its planning application (W/25/00655/GPJ) went to Wychavon on 31 March 2025 and was granted on 23 May 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Deritend Precision Casting, Vines Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 5.6 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home5.6 kmSignificant
EIR-12722022Fire in solar panel distribution board at Birmingham college30 kmMinor
EIR-15512019Fire involving solar panels on a garage roof in Shropshire40 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Green Nation Solar Energy
Location
Deritend Precision Casting Ltd Vines Lane, Worcestershire, WR9 8LX, United Kingdom
Planning authority
Wychavon
Planning application
W/25/00655/GPJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/25/00655/GPJ, with what the planning evidence pack adds for this site.

Every application in Wychavon · Alerts for applications and incidents near here

  • 31 March 2025 Planning application submitted
  • 23 May 2025 Planning permission granted

None found. The register holds no published incident that names Deritend Precision Casting, Vines Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Deritend Precision Casting, Vines Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Deritend Precision Casting, Vines Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Deritend Precision Casting, Vines Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
Where is Deritend Precision Casting, Vines Lane - Solar Panels?
In Droitwich, Worcestershire, United Kingdom (postcode WR9 8LX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).