Planning pack for this site, £295Other options

Battery storage · United Kingdom

Fibden Farm, Hampton Lovett - Battery Energy Storage System

Operator Grenergy Renewables · Owner Gr Renewables 1 Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 30 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Fibden Farm, Hampton Lovett - Battery Energy Storage System is a battery storage site 4.2 km north of Droitwich, Worcestershire, United Kingdom. Its planning application (W/24/01088/FUL) went to Wychavon on 14 June 2024 and was granted on 29 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

GRENERGY RENEWABLES UK LIMITED (12875804), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fibden Farm, Hampton Lovett - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 67 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire67 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells114 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool131 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Grenergy Renewables
Owner
Gr Renewables 1 Limited
Location
S/O Broad Alley, Hampton Lovett, Cutnall Green, Droitwich, Worcestershire, WR9 0NA, United Kingdom
Planning authority
Wychavon
Planning application
W/24/01088/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/24/01088/FUL, with what the planning evidence pack adds for this site.

Every application in Wychavon · Alerts for applications and incidents near here

  • 14 June 2024 Planning application submitted
  • 29 July 2025 Planning permission granted
  • 29 July 2028 Planning permission runs out

None found. The register holds no published incident that names Fibden Farm, Hampton Lovett - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Fibden Farm, Hampton Lovett - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fibden Farm, Hampton Lovett - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Fibden Farm, Hampton Lovett - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 March 2026.
Where is Fibden Farm, Hampton Lovett - Battery Energy Storage System?
4.2 km north of Droitwich, Worcestershire, United Kingdom (postcode WR9 0NA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).