Solar · United States

Dartmouth II Solar

Operator RWE Americas, LLC · Owner RWE Clean Energy

Operational2 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dartmouth II Solar is a 2 MW solar farm 7.1 km north of Head of Westport, Bristol County, Massachusetts, United States. It first operated in 2012. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 26 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 184 other sites and 199 energy sites within 40 km for Dartmouth II Solar

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
RWE Americas, LLC
Owner
RWE Clean Energy
Location
Bristol County, Massachusetts, United States
First operating
2012
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Dartmouth II Solar. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Dartmouth II Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dartmouth II Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Dartmouth II Solar?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Dartmouth II Solar?
7.1 km north of Head of Westport, Bristol County, Massachusetts, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).