← Back to Dorset
Planning pack for this site, £295Other options

Solar · United Kingdom

Damers First School - Solar Panels

Operator Solar Options for Schools Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 18 June 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Damers First School - Solar Panels is a 0.2 MW solar farm on the edge of Dorchester, Dorset, United Kingdom. Its planning application (P/PASO/2025/01529) went to Dorset on 17 March 2025 and was granted on 21 May 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

SOLAR OPTIONS FOR SCHOOLS LIMITED (09812345), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Damers First School - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1526, Solar panels catch fire on a retail or public building roof in South Petherton, 36 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton36 kmMinor
EIR-13962024Solar panel fire leads to Travelodge evacuation in Poole36 kmMinor
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown41 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Solar Options for Schools Limited
Location
Damers First School, Liscombe Street, Poundbury, Dorchester, Dorset, DT1 3DF, United Kingdom
Planning authority
Dorset
Planning application
P/PASO/2025/01529

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/PASO/2025/01529, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 17 March 2025 Planning application submitted
  • 21 May 2025 Planning permission granted

None found. The register holds no published incident that names Damers First School - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Damers First School - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Damers First School - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Damers First School - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 June 2025.
Where is Damers First School - Solar Panels?
On the edge of Dorchester, Dorset, United Kingdom (postcode DT1 3DF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).