Onshore wind · United Kingdom
Dalby
Operator Ecotricity
Operational7.2 MWData checked 16 November 2026Source record dated 20 May 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Dalby is a 7.2 MW wind farm 8.1 km south-east of Keyworth, Leicestershire, United Kingdom. Its planning application (10/00333/FUL) went to Melton on 19 May 2010 and was granted on 17 December 2010. It has been operating since 15 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Dalby changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
ECOTRICITY LIMITED (03043412), active, since 1995. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 7.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Ecotricity
- Location
- Paddys Lane, Old Dalby, Melton Mowbray, Leicestershire, Leicestershire, LE14 3LY, United Kingdom
- Planning authority
- Melton
- Planning application
- 10/00333/FUL
- First operating
- 2016
- Turbines
- 9, 77 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/00333/FUL, with what the planning evidence pack adds for this site.
Every application in Melton · Alerts for applications and incidents near here
Timeline
- 19 May 2010 Planning application submitted
- 17 December 2010 Planning permission granted
- 1 February 2015 Construction started
- 15 March 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Dalby. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Dalby had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Dalby; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Dalby?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2016.
- Where is Dalby?
- 8.1 km south-east of Keyworth, Leicestershire, United Kingdom (postcode LE14 3LY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).