Solar · United Kingdom

Dairy Way, Northway Lane, Unit 22 - Solar Panels

Operator Cotteswold Dairy Limited

Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 12 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dairy Way, Northway Lane, Unit 22 - Solar Panels is a 0.6 MW solar farm on the edge of Tewkesbury, Gloucestershire, United Kingdom. Its planning application (26/00076/PDSOL) went to Tewkesbury on 2 February 2026 and was granted on 19 March 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dairy Way, Northway Lane, Unit 22 - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home32 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire35 kmSignificant
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries37 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cotteswold Dairy Limited
Location
Unit 22, Dairy Way, Northway Lane, Tewkesbury, Gloucestershire, GL20 8JE, United Kingdom
Planning authority
Tewkesbury
Planning application
26/00076/PDSOL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00076/PDSOL, with what the planning evidence pack adds for this site.

Every application in Tewkesbury · Alerts for applications and incidents near here

  • 2 February 2026 Planning application submitted
  • 19 March 2026 Planning permission granted
  • 19 March 2031 Planning permission runs out

None found. The register holds no published incident that names Dairy Way, Northway Lane, Unit 22 - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Dairy Way, Northway Lane, Unit 22 - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dairy Way, Northway Lane, Unit 22 - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dairy Way, Northway Lane, Unit 22 - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2026.
Where is Dairy Way, Northway Lane, Unit 22 - Solar Panels?
On the edge of Tewkesbury, Gloucestershire, United Kingdom (postcode GL20 8JE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).