Solar · United Kingdom

D W Windsor, Pindar Road - Solar Panels

Operator Webster Estates Limited

Abandoned0.3 MWData checked 16 November 2026Source record dated 9 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

D W Windsor, Pindar Road - Solar Panels is a 0.3 MW solar farm in Hoddesdon, Hertfordshire, United Kingdom. Its planning application (07/23/1008/P4D) went to Broxbourne on 5 December 2023 and was granted on 16 January 2024. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 40 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

767 energy sites within 40 km for D W Windsor, Pindar Road - Solar Panels

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Webster Estates Limited
Location
D W Windsor Ltd Pindar Road, Hertfordshire, EN11 0DX, United Kingdom
Planning authority
Broxbourne
Planning application
07/23/1008/P4D

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 07/23/1008/P4D, with what the planning evidence pack adds for this site.

Every application in Broxbourne · Alerts for applications and incidents near here

  • 5 December 2023 Planning application submitted
  • 16 January 2024 Planning permission granted

None found. The register holds no published incident that names D W Windsor, Pindar Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has D W Windsor, Pindar Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names D W Windsor, Pindar Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of D W Windsor, Pindar Road - Solar Panels?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 9 July 2024.
Where is D W Windsor, Pindar Road - Solar Panels?
In Hoddesdon, Hertfordshire, United Kingdom (postcode EN11 0DX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).