Solar · United Kingdom

Culworth House Solar Farm

Operator Private Developer

Operational3 MWData checked 16 November 2026Source record dated 13 April 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Culworth House Solar Farm is a 3 MW solar farm 9.3 km north-west of Brackley, Northamptonshire, United Kingdom. Its planning application (S/2011/0314/MAF) went to West Northamptonshire on 11 March 2011 and was granted by the Secretary of State on 4 March 2013. It has been operating since 15 January 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 16 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 409 other sites and 520 energy sites within 40 km for Culworth House Solar Farm

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Private Developer
Location
East of Banbury Lane, Culworth Grounds Farm, Thorpe Manderville, Northamptonshire, United Kingdom
Planning authority
West Northamptonshire
Planning application
S/2011/0314/MAF
Appeal reference
APP/Z2830/A/11/2155999
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/2011/0314/MAF, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 11 March 2011 Planning application submitted
  • 10 June 2011 Planning permission refused
  • 28 July 2011 Appeal lodged
  • 4 March 2013 Planning permission granted
  • 4 March 2013 Granted by the Secretary of State
  • 4 March 2013 Appeal granted
  • 1 September 2014 Construction started
  • 15 January 2015 Operational

None found. The register holds no published incident that names Culworth House Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Culworth House Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Culworth House Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Culworth House Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 13 April 2015.
Where is Culworth House Solar Farm?
9.3 km north-west of Brackley, Northamptonshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).