← Back to Texas

Battery storage · United States

Crowned Heron 1 - Storage, LLC

Operator RWE Americas, LLC · Owner RWE Clean Energy

Operational150 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Crowned Heron 1 - Storage, LLC is a 150 MW battery storage site 9.7 km south-east of Greatwood, Fort Bend County, Texas, United States. It first operated in 2026. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 3 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 184 other sites and 69 energy sites within 40 km for Crowned Heron 1 - Storage, LLC

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (300 MWh)
Capacity
150 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
RWE Americas, LLC
Owner
RWE Clean Energy
Location
Fort Bend County, Texas, United States
First operating
2026
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Crowned Heron 1 - Storage, LLC. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Crowned Heron 1 - Storage, LLC had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crowned Heron 1 - Storage, LLC; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Crowned Heron 1 - Storage, LLC?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Crowned Heron 1 - Storage, LLC?
9.7 km south-east of Greatwood, Fort Bend County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).