Solar · United Kingdom
Crouch Solar Farm
Operator Low Carbon Storage
Operational49.9 MWData checked 16 November 2026Source record dated 30 October 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Crouch Solar Farm is a 49.9 MW solar farm 5.2 km south-west of Billericay, Essex, United Kingdom. Its planning application (21/00834/FUL) went to Brentwood on 7 May 2021 and was granted on 23 December 2021. It has been operating since 30 October 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 66 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Crouch Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Low Carbon Storage
- Location
- Park Farm, Dunton Road, Brentwood, Essex, CM13 3SG, United Kingdom
- Planning authority
- Brentwood
- Planning application
- 21/00834/FUL
- First operating
- 2024
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/00834/FUL, with what the planning evidence pack adds for this site.
Every application in Brentwood · Alerts for applications and incidents near here
Timeline
- 7 May 2021 Planning application submitted
- 23 December 2021 Planning permission granted
- 1 July 2023 Construction started
- 30 October 2024 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Crouch Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Crouch Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Crouch Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Crouch Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 October 2024.
- Where is Crouch Solar Farm?
- 5.2 km south-west of Billericay, Essex, United Kingdom (postcode CM13 3SG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).