Onshore wind · United Kingdom
Crockandun
Operator Brookfield Renewable Energy Group
Operational15 MWData checked 16 November 2026Source record dated 28 July 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Crockandun is a 15 MW wind farm 11 km west of Magherafelt, Co. Derry / Londonderry, United Kingdom. Its planning application (H/2010/0009/F) went to Mid Ulster on 8 January 2010 and was granted on 30 November 2012. It has been operating since 9 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 18 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Crockandun changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 15 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Brookfield Renewable Energy Group
- Location
- approximately 450m west south-west of junction of Cullion Road and Drumard Road, Draperstown, Magherafelt., Co. Derry / Londonderry, BT45 5NR, United Kingdom
- Planning authority
- Mid Ulster
- Planning application
- H/2010/0009/F
- First operating
- 2017
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for H/2010/0009/F, with what the planning evidence pack adds for this site.
Every application in Mid Ulster · Alerts for applications and incidents near here
Timeline
- 8 January 2010 Planning application submitted
- 30 November 2012 Planning permission granted
- 15 January 2016 Construction started
- 9 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Crockandun. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Crockandun had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Crockandun; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Crockandun?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2017.
- Where is Crockandun?
- 11 km west of Magherafelt, Co. Derry / Londonderry, United Kingdom (postcode BT45 5NR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).